Succession War

HUNTER×HUNTER chapter 421

Chapter 421 has no announced release date. The most recent milestone confirmed in public is Delivered to Jump, recorded on May 26, 2026.

Where this sits in production

Confirmed stage
Delivered to Jump
Confirmed on
May 26, 2026
Volume
Volume 41
Story arc
Succession War

Chapter 421: sourced production history

Posts that explicitly mention this chapter, oldest first. Starting work is not the same as completing it; a completed manuscript is not a release announcement.

  1. No.421, manuscript complete. My temporary tooth cracked.

    Read this update

A production milestone describes work on the manuscript. Only an announcement from Shueisha or Weekly Shonen Jump establishes a publication date.

Bayesian models · no official announcement

When could chapter 421 return?

Two exploratory models: historical interruptions and a scenario informed by Togashi’s manuscript reports. Probabilities depend on their assumptions.

Scenario informed by Togashi’s posts

Assumption: Jump waits for ten finished manuscripts, then an editorial delay. This is not an announced rule. 7/10 are confirmed; 3 have no completion announcement.

Model median
March 2027
Central 80% predictive interval
December 2026January 2028

Reference: historical interruptions

Model median
April 2027
Central 80% predictive interval
October 2026August 2030

Calculated Sep 12, 2026 · 9 interruptions, 3 with exact calendar dates.

80% probability within a model does not establish 80% real-world reliability. Data are sparse and editorial decisions remain unknown.

Modelled probability of return within the next…

Scenario informed by Togashi’s posts

90 days
12%
180 days
47%
365 days
82%
730 days
95%
Cumulative probability from the calculation date
0%50%100%06121824Months from calculation
━ Scenario informed by Togashi’s postsReference: historical interruptions
Method, historical checks and limitations

Scenario informed by Togashi’s posts

Announcement rate: Poisson process with a Gamma(1, 30) prior in days. Time without a new announcement is included. The delay after the tenth manuscript uses another Bayesian log-normal model: only 1 usable historical cycle, so strong prior dependence and no out-of-sample validation of this scenario. Reports may be delayed or incomplete.

λ ~ Gamma(1, rate = 30)
λ | posts ~ Gamma(7, rate = 138)
W | λ ~ Gamma(r = 3, rate = λ)
P(W ≤ w | posts) = I[w/(β+w)](r, α)
R = W + L ; log(L) | data ~ Student-t
P(R ≤ t) = ∫ F_L(t − w) p(w | posts) dw

Reference cycle: chapter 411, batch completed Feb 24, 2026, return Jun 29, 2026 — 125 days.

Centering the editorial-delay prior on 30 or 180 days instead of 90 moves the scenario median to February 2027 or April 2027.

Manuscript-completion reports used

Reference: historical interruptions

Historical reference: every completed interruption since 2014 between consecutive numbered chapters, including short breaks. Duration runs from the last chapter to the return. Exact dates take precedence; otherwise assume 48 Jump issues per year.

Log duration is normally distributed. A normal–inverse-gamma prior represents uncertainty in its mean and variance. Integrating both yields a Student-t predictive distribution, conditioned on no return by the calculation date. Recomputed at each site build.

yᵢ = log(Tᵢ) ~ Normal(μ, σ²)
σ² ~ InvGamma(α₀, β₀) ; μ | σ² ~ Normal(μ₀, σ²/κ₀)
κₙ = κ₀+n ; μₙ = (κ₀μ₀+nȳ)/κₙ
αₙ = α₀+n/2
βₙ = β₀ + Σ(yᵢ−ȳ)²/2 + κ₀n(ȳ−μ₀)²/(2κₙ)
log(Tnew) | data ~ t₂αₙ(μₙ, √[βₙ(κₙ+1)/(αₙκₙ)])
P(T ≤ t | T > e, data) = 1 − S(t)/S(e)

μₙ = 5.3454 ; κₙ = 9.25
αₙ = 6.5 ; βₙ = 11.7051
df = 13 ; scale = 1.4126

Parameters, priors and sensitivity

The historical prior centers log(T) on log(365.2425 days), with κ₀ = 0.25, α₀ = 2 and β₀ = 1. Centering on 180 or 730 days instead gives medians of April 2027 and April 2027.

Using eligible history since 1998 gives a median of October 2026.

Short and long interruptions are heterogeneous; one distribution cannot describe every regime change. The 2014 cutoff and issue-to-day conversion are assumptions, not learned parameters. No medical information is inferred from posts. An official date hides these estimates.

Chronological validation on 6 returns: mean absolute error 436 days; 5/6 inside the 80% interval. Each prediction uses only previously completed interruptions.

Comparison with a fitted log-normal without parameter uncertainty: error 442 days. Mean log score: Bayes -7.9, reference -7.92 (higher is better). So few returns cannot establish superiority.

Completed breaks used by the model
Return chapterMissing Jump issuesIssue count
3462014 #322014 #321
3492014 #362014 #361
3502014 #392016 #1980
3612016 #322017 #2946
3712017 #412018 #818
3812018 #192018 #4222
3912019 #12022 #46184
4012023 #62024 #4484
4112025 #32026 #3073

Sources and complete hiatus history

Unofficial HUNTER×HUNTER chapter and production tracker.